FEATURED PROJECTS
The following projects are just a small sampling of what Pizzagalli’s Special Project teams can do for our clients. These highly skilled teams can perform an extensive range of work in all of our markets, from small hospital renovations to complex energy projects. CLICK A PROJECT TITLE BELOW TO
LEARN MORE.
Because of the nature of our Special Projects work, photos are often difficult to obtain.
| |
|
|
|
|
|
|
|
 |
|
WTP Filter Structure, Rutland, VT: The removal of 220 precast planks, each weighing up to 15 tons, and the installation of a new 60,000 square foot precast concrete roof over operating filters and a new membrane roof system |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
University of Maine Cutler Health Renovations Phase I, Orono, ME: A renovation of 7,500 square feet of existing clinical space in just five weeks |
|
 |
|
University of Maine Cutler Health Renovations Phase II, Orono, ME: A three-week fast-track renovation of 8,600 square feet of existing space including walls, ceilings, flooring, electrical, and mechanical work in 10 exam rooms, 8 bathrooms, a physical therapy room, optometry room, waiting room, counseling center waiting room, break room, and meeting room |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Bolton Falls Timber Crib Dam Repair, Duxbury, VT: The installation of a temporary cofferdam and dewatering of the head pond to remove and replace the existing timber crib dam |
|
 |
|
Essex #19 Dam Repair, Essex, VT: The repair of over 300 square feet of dam facing, including demolition and associated concrete work |
|
| |
|
|
|
|
|
|
|
 |
|
Vergennes Hydro #19 Unit #1, Vergennes, VT: The demolition of an existing turbine and support bridge and installation of a new one megawatt turbine with ancillary items, and structural steel support bridge, in addition to rewiring the existing generator, electrical, and controls. |
|
 |
|
Essex Hydro Minimum Flow Unit, Essex, VT: The demoliltion of an existing an existing turbine and installation of a new .85 megawatt turbine with ancillary items, penstock, electrical, and controls. |
|
| |
|
|
|
|
|
|
|
 |
|
Essex #19 Diesels, Essex,
VT: The demolition of existing generators and installation of four new two megawatt diesel generators |
|
 |
|
Marshfield Penstock Replacement, Marshfield,
VT: The replacement of three miles of 60-inch penstock over a three-year period |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Home Store Fit-Out, Freeport, ME: A renovation of 11,000 square feet of existing space in eight weeks, including new walls, carpet, ceiling, paint, drywall, electrical, fire alarm, and new wood flooring |
|
 |
|
Kids Store Fit-out, Freeport, ME: The renovation the 11,000 square feet existing Kids Store in four weeks, including new walls, carpet, ceilings, paint, drywall, electrical, fire alarm, and new wood flooring |
|
| |
|
|
|
|
|
|
|
 |
|
Moose Shed, Freeport, ME: An expansion to the L.L. Bean Flagship Store to serve as an exhibit, including new foundation, exterior walls, and roof |
|
 |
|
Returns Building Window Repairs, Freeport, ME: Removed existing windows, installed new sill and flashing for window, and reinstalled existing windows |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Eastern Maine Community College Maine Hall Window Replacement, Bangor, ME: A fast-track replacement of 205 windows, including the demolition of the existing window systems, framing in the exterior opening for smaller windows, installing densglass, new vinyl windows, EIFS, and caulking on the exterior |
|
 |
|
Southern Maine Community College Concrete Floor Repairs, South Portland, ME: The removal and replacement the damaged concrete floor and metal decking in the Construction Technology Department |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Agency Market Fit-out, Portland, ME: A 4,000 square foot renovation to construct a new conference room, break area, and vice president’s office within existing building, including new walls, drywall, flooring, paint, and ACT ceilings |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Burlington Health & Rehab Structural Upgrades, Burlington, VT: The structural repair of the precast concrete plank in the existing five-story building |
|
 |
|
Berlin Health & Rehab, Berlin, VT: Interior architectural repairs and upgrades to the existing building |
|
| |
|
|
|
|
|
|
|
 |
|
Rowan Health & Rehab, Barre, VT: Interior architectural repairs and upgrades to the existing building |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Sprinkler Break Repairs, Scarborough, ME: The repair of damaged drywall due to a sprinkler break at Scarborough High School |
|
 |
|
Door, Window, and Masonry Replacement, Scarborough, ME: The replacement of four doors and frames at Wentworth Middle School due to water infiltration |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Cogeneration Facility, Coventry, VT: A fast-track, design/build, 7,000 square foot cogeneration facility capable of producing 4 megawatts of electricity and including the installation of gas, engine cooling water, oil, waste oil, compressed air, antifreeze, and hot water process piping systems; since the original project was constructed, Pizzagalli has added two additional gensets, increasing capacity to 7.5 megawatts |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Colocation Transmission Building, Stowe, VT: A new 7,000 square foot transmission building on the summit of Mt. Mansfield for the broadcast of high definition television; facility was constructed over the existing transmission building with transferring systems before the existing building was demolished to allow for 24/7 operation |
|
|
|
|
|
| |
|
|
|
|
|
|
|