Education Construction Energy Construction Health Care Construction Hospitality and Commercial Construction Manufacturing and Industrial Construction Special Projects
Pizzagalli Construction History Pizzagalli Construction Timeline Pizzagalli Construction Company News Pizzagalli Construction Company Blog
Markets Services LEED Certified Construction Featured Projects Client Testimonials Case Studies
Career Opportunities Employee Ownership Benefits Employee Development College Recruiting Meet Our Crew
Community Sustainable Construction Services
Employment Partnership Opportunities

FEATURED PROJECTS

 

Our experience with sophisticated and specialized processes allows us to develop facilities as unique as the businesses that thrive in them. Here are just a few. CLICK A PROJECT TITLE BELOW TO LEARN MORE.

spacer
               
Pre-Outfit 2 Building Modifications, Bath, ME   Pre-Outfit 2 Building Modifications, Bath, ME: The demolition of a 200’ x 140’ portion of an existing high-bay shipyard assembly building and construction of a new addition measuring 282’ x 236’ x 106’ tall          
               
               
Building Core and Shell, Lebanon, NH   Building Core and Shell, Lebanon, NH: A 21,500 square foot, one story biological laboratory research facility   Building Fit-up, Lebanon, NH   Building Fit-up, Lebanon, NH: Fit-up of 21,500 square feet of laboratory and support space for use by Dartmouth College’s Biology Department  
               
               
Hot Runner Facility, Milton, VT   Hot Runner Facility, Milton, VT: A new 200,000 square foot manufacturing facility on a 750-acre site   Tool Foundations, Milton, VT   Tool Foundations, Milton,
VT:
A modification to the existing foundation to provide additional structural support for new manufacturing tool placements
 
               
Plate Line Addition, Milton, VT   Plate Line Addition, Milton, VT: Lorem ipsum dolor sit amet, aliquip, nibh saepius antehabeo luptatum enim quidem minim.          
               
               
Sustaining Work Contract, New York and Vermont Sites   Sustaining Work Contract, New York and Vermont Sites: Preconstruction and construction management services including feasibility studies, procurement and management of design services, projects ranging in size and scope including tool installs, office and cafeteria modifications, testing and packaging facilities, clean room modifications and upgrades, laboratory renovations, and utility and system upgrades          
               
               
Outpatient Surgery Center   Research & Manufacturing Renovation and Expansion, Westbrook, ME: A fast-track, multi-phased 210,000 square foot manufacturing addition including the demolition of a 160,000 square foot building and renovation to 70% of the existing space   Outpatient Surgery Center   Water Manufacturing, Westbrook, ME: An 8,785 square foot, two-phase expansion of the water quality testing facility  
               
               
Tailings Dewatering Facility, Florence, VT   Tailings Dewatering Facility, Florence, VT: A new three story tailings dewatering facility containing process equipment and piping          
               
               
National Cold Water Marine Aquaculture Facility, Franklin, ME   National Cold Water Marine Aquaculture Facility, Franklin, ME: A new 40,000 square foot aquaculture center with wet lab space, fish containment rooms, water treatment rooms, material/waste locks, effluent treatment building, two research tank out-buildings, and specialized aquaculture tanks, systems, and piping for Atlantic Salmon research and development          
               
BackgroundBackgroundMeet Our CrewNewsBlogLinksSite MapPrivacy PolicyTerms of UseHomeBackground100% Employee OwnedBackgroundBackgroundCopyright 2010 Pizzagalli Construction CompanyBackgroundBackground100% Employee OwnedBackground