CASE STUDIES
Every project starts with a challenge, an idea, or an opportunity. Through the talents and skills of the entire Pizzagalli team, we rise to the challenge, turn an idea into reality, and produce significant benefits for our clients. We, like our clients, are proud of these accomplishments and would like to share some stories with you.
Anarobic Digester for Purpose Energy
The Challenge: Modify the digester vessel, the primary component for the anaerobic digestion process, mid-way through this designbuild project at a Vermont micro-brewery to accommodate the client’s revised schedule and financing delays without impacting the integrity of the process. > Download PDF
Coventry Landfill Gas Fire Restoration
The Challenge: During routine operation at the Washington Electric Cooperative in Coventry, Vermont, a fire started in one of the engines and quickly spread throughout the building rendering the facility useless. > Download PDF
Green Mountain Power
Penstock Replacement Phase II
The Challenge: Identify the appropriate penstock material for Green Mountain Power for Phase II of their penstock replacement project, which Pizzagalli originally began constructing the previous year. > Download PDF
Vermont Public Power Supply Authority 40 MW Electrical Power Peaking Plant
The Challenge: The owner-furnished Electrical Service Building was found to significantly exceed the budget and impact the project schedule. The Pizzagalli team needed to quickly find an alternative that would allow the project to stay on schedule and within budget. > Download PDF