| |
|
|
|
|
|
|
|
 |
|
New Hampshire Hall Renovation, Hanover, NH: A renovation to an existing 120-bed residence hall including two additions to enclose external steel stair towers, upgrades to the mechanical, electrical, and plumbing systems, and new bathrooms, student kitchens, and windows. |
|
 |
|
Hitchcock Hall Renovations, Hanover, NH: A complete interior and exterior renovation of an existing 28,000 square foot, 4-story residence hall, including life safety and ADA compliance upgrades, new mechanical, electrical, and plumbing systems, and a new elevator and shaft |
|
| |
|
|
|
|
|
|
|
 |
|
Andrews, Zimmerman, Morton Dormitory Renovations, Hanover, NH: The fast-track renovation of three dormitory buildings totaling 65,000 square feet and 188 beds in just 10 weeks |
|
 |
|
Boiler No. 2 Replacement, Hanover, NH: The replacement of the existing boiler with a new 75,000 lb./hr. boiler as well as renovations to the existing steam plant, replacement of the existing 100-year old roof. |
|
| |
|
|
|
|
|
|
|
 |
|
Central Chilled Water Plant and Upgrade, Hanover, NH: Construction of new chilled water plant and upgrade to existing facilities, including installation of two 800 nominal ton steam absorption water chillers, two 650-ton chillers, two 38,700 MBH induced draft counter-flow cooling tower cells and ancillary equipment and system modifications |
|

|
|
Buchanan Hall Renovations for Tuck School of Business, Hanover, NH: A 27,000 square foot renovation to an existing 4-story building to serve as office and residential space, including new plumbing, mechanical and electrical systems, and elevator as well as an entryway addition, enclosed connector, selective demolition, and asbestos abatement |
|
| |
|
|
|
|
|
|
|